A sheet metal fan housing quote that looks 20% cheaper often leaves out a seam finish, a coating spec or a flatness requirement. You find the gap after the purchase order, when the change request arrives. Procurement teams comparing custom fan housing quotes need the quotes built on the same assumptions before the unit prices mean anything.
Lingyufab (Shanghai Lingyu Industry) is a sheet metal and fastener manufacturer founded in 2003. We work to customer drawings under OEM/ODM terms. Our scope covers laser cutting, CNC bending, stamping, TIG/MIG welding and surface finishing, plus installed fasteners. For fan-related work, that scope is shown in our Custom Fan Case Assemblies. The fabrication and assembly stay under one roof, which removes the intermediary margin and extra logistics between separate shops. Under our in-house vertical integration model, that is where the 15-20% overall cost reduction comes from.
This article is for buyers who must justify a number. It shows what actually moves a quote and what to put in an RFQ so the answers can be compared.

Sheet metal fan housing cost is the sum of six separate lines. Quotes that show one lump price hide which line carries the risk. Ask your supplier to split the price along these lines, or at least confirm the assumption behind each one.
| Cost line | What drives it | Design choice that raises it | Design choice that lowers it |
|---|---|---|---|
| Blank size and material yield | Sheet area consumed per part, including nesting waste | Large circular or scroll-shaped blanks that nest poorly; grain-direction limits | Splitting a wide shell into two nestable pieces; standard sheet-friendly dimensions |
| Rolling or forming complexity | Number of bends or roll operations, setups, and handling | Tight inner radii, conical sections, flanges on both rims | Fewer bends, consistent radii, one forming direction |
| Welded seams | Seam length, weld type, fixturing, post-weld cleanup | Continuous sealed seams, cosmetic weld blending on stainless | Intermittent or spot welds where airtightness is not needed |
| Finish requirements | Surface prep, coating or plating steps, masking, cure time | Multi-layer coating, masked threads or ground-contact areas | Single coating spec, masking limited to required zones |
| Mounting and fastener features | Installed hardware count, hole positioning accuracy | Many welded or clinched studs, tight position tolerance | Standard hardware, fewer fixing points |
| Low-volume setup | Programming, fixturing and first-article checks spread over few parts | Prototype runs with custom welding jigs | Shared fixtures, quantity breaks, repeat orders on the same program |
Blank size and yield are paid for in every part, regardless of volume. Setup is different: it is spread across quantity, so it dominates at 1 to 100 pieces and nearly disappears at mass-production volume. That is why a prototype price per piece says very little about the production price.
Limit of this model: it explains direction, not exact figures. Real pricing depends on the drawing, the material grade and the current sheet price, so any supplier who quotes without a drawing is guessing.
Material changes the quote three ways: sheet price, how the metal behaves in welding and forming, and which finish it needs. We process carbon steel, stainless steel (304/316) and aluminum.
| Material | Fits when | Cost effect | Watch for |
|---|---|---|---|
| Carbon steel | Indoor equipment, enclosed cabinets, cost-driven volume | Lowest material cost; needs a coating or plating step | Finish adds a line to the quote; edge corrosion if coating is thin |
| 304 stainless | Food, general industrial and humid environments | Higher sheet price; offcut waste costs more per kg | Weld discoloration and cosmetic cleanup add labor |
| 316 stainless | Chemical, coastal or washdown conditions | Highest sheet cost of the three | Specify only when the environment demands it; 304 is enough for many indoor cases |
| Aluminum | Weight-sensitive or heat-dissipating designs | Depends on alloy and welding method | Weld distortion and anodizing requirements |
A stainless steel fan housing usually skips the coating line but takes on more weld finishing. If the stainless part is hidden inside a cabinet, accepting a plain weld bead can cost less than a blended cosmetic seam. If it is visible to the end user, the opposite holds. State which applies in the RFQ.
Most price surprises come from small features, not from the main shell. Check these before releasing the drawing.
Tolerances on every dimension. We hold tolerances down to ±0.05mm on precision fabrication, but applying that to the whole part is rarely necessary. Mark the datum and fit-critical features, such as the motor mounting pattern and inlet ring, and relax the rest.
Cutouts and vent patterns. Laser cutting handles complex outlines without dies, but dense patterns lengthen cut time. See our Precision Sheet Metal Laser Cutting Services for what the process covers.
Bend count and radii. Each extra bend is a handling and inspection step. Consistent radii let the press brake setup stay the same across the part. Review sheet metal bending options before locking the geometry.
Installed fasteners. Welded nuts, studs and clinched hardware add fixture time but avoid loose parts at the customer's line. Options include Custom Nut-Welded Sub-Assemblies and self-clinching components.
Weld type and seam length. Specify whether the seam must be airtight. A structural-only seam is cheaper than a sealed one.
Fan housing tooling cost is a real line only if the design needs stamping dies. Many housings can be made from laser-cut blanks and bent or formed parts, which avoids dedicated tooling. That route suits prototype and low-to-mid volumes where drawings may still change.
Prototype and pilot stage. Use laser cutting and bending. We accept zero MOQ at the prototyping phase, from one piece to a 100-piece pilot, so you can test fit and airflow before committing capital.
Design freeze. Once the drawing stops changing, ask for a quote on a stamped version of the repeating features, such as end plates or mounting rings.
Break-even check. Compare die cost divided by expected total volume against the per-piece saving. If the programme is uncertain or likely to change revision, the die can cost more than it saves.
Limit: dies do not help low-volume, high-mix programs, and they lock the design in place. For those, flexible fabrication is usually the better fit, which matches our High-Mix, Low-Volume support. Our sheet metal prototyping page describes the early-stage route.
This is an illustrative scenario, not a customer case. A buyer sends a 304 stainless housing drawing to two suppliers.
Quote A assumes one rolled shell with one welded seam, a plain bead and no coating.
Quote B assumes two pressed halves, two seams, cosmetic blending and passivation.
Quote B will cost more in welding and finishing, but it may nest better on the sheet and give a cleaner outer appearance. Neither quote is wrong. They answer different questions. Without a written assumption sheet, the buyer may pick the lower number and then pay for the missing blending as a change order. Ask both suppliers to re-quote against a single statement of seam type, finish and tolerance.
Sending a 3D model only, with no 2D drawing showing tolerances and finish.
Leaving the weld type unspecified, so suppliers price sealed and structural seams differently.
Requesting one quantity, then comparing it with a production quantity from another quote.
Applying the tightest tolerance to non-critical dimensions.
Omitting the material grade (304 or 316) or accepting "stainless" as a spec.
Ignoring packaging and freight terms, which change the landed price.
For a buyer deciding whether a supplier fits, evidence matters more than claims. Here is what we can document for a fan housing programme.
Certifications: ISO 9001:2015, ISO 14001 and TÜV CE. We are also a Mitsubishi Electric certified core supplier, working to Japanese quality standards.
Inspection: 100% dimensional and visual inspection before shipment, plus Mill Test Certificates (MTC) for every batch, giving material traceability back to the sheet.
Lead time: typically 7-10 days for samples and 20-30 days for bulk. A 48-hour rapid delivery option exists for urgent orders, subject to part complexity and schedule.
Remedy: free replacement or repair if a quality issue is traced to a manufacturing defect.
Capacity: over 8,000 fasteners and sheet metal assemblies delivered monthly.
The timelines and remedy terms above are standard reference points. Final dates, acceptance criteria and responsibility for design-related issues should be written into the PO for each project. For adjacent hardware on the same build, see our Fasteners range and Sheet Metal Assemblies.

Use this list when you request a custom fan housing quote. It lets us price accurately and lets you compare suppliers on equal terms.
2D drawing with critical tolerances and datums marked.
Material and grade, for example 304 or 316 stainless, carbon steel or aluminum.
Weld requirement: sealed or structural, and the cosmetic standard.
Finish specification and any masked areas.
Installed hardware list and thread requirements.
Quantities for prototype, pilot and annual forecast.
Delivery destination and any packaging requirements.
Send your drawings and the checklist items to our engineering team and request a quote. We will return a line-by-line price with the assumptions stated, so your team can use it directly in a comparison.