How much heat can a thin panel absorb before it oil-cans, bows, or pulls a hole pattern off position? That is the question behind most rejected weld jobs. Sheet metal welding on thin gauge leaves little thermal mass to carry heat away, so every extra joule shows up as shrinkage somewhere in the part.
This guide takes you from a drawing with weld callouts to a written weld plan for each joint. The plan names the process, the sequence, the heat controls and the acceptance check. It is written for OEM design teams and fabricators preparing specifications for panels, enclosures, brackets and cosmetic parts before prototype release.
Start by writing down your budget: the flatness limit, the position tolerance of nearby features, and which faces are cosmetic. We machine and bend parts to tolerances down to ±0.05 mm, so a weld seam that moves a datum feature by 0.3 mm defeats that precision. If the budget is very tight, consider a low-heat process such as fiber laser welding services, which deposits energy in a narrow zone. Arc processes remain practical for many joints, as long as you control how much energy goes in.
Some inputs block the plan completely. Others can be settled during the first trial. Use this table to sort them.
| Input | Why it matters | Blocks progress? |
|---|---|---|
| Material grade and thickness (for example 304/316 stainless, carbon steel, aluminum) | Thermal conductivity and expansion decide how heat spreads and how far the part moves | Yes |
| Joint type and total seam length | Sets the choice between continuous and stitch welds | Yes |
| Seal requirement (watertight, dust-tight, or structural only) | Rules stitch welding in or out | Yes |
| Cosmetic faces and flatness limit | Determines whether backing, low-heat processes or post-weld finishing are needed | Yes |
| Fixture and clamp access | Affects how well you can restrain and chill the joint | Can be settled during prototype |
| Filler wire type and gas flow | Fine-tuned on the trial coupon | Can be settled during prototype |
You also need one number to compare options: heat input per unit length. The usual formula is:
Heat input (kJ/mm) = (Voltage × Current × 60) ÷ (Travel speed in mm/min × 1000) × process efficiency
Common efficiency factors are about 0.6 for TIG and about 0.8 for MIG. Treat them as planning values and confirm against your welding procedure standard. The goal is to get the lowest heat input that still gives full fusion, not to hit a universal figure.
Not every joint needs every control. Adding all of them to every joint costs cycle time and can create new defects. This table shows where each control earns its place. The thickness and length bands are starting points to verify on a trial coupon, not fixed limits.
| Condition | Control to apply | Reason | Limit: when it does NOT apply |
|---|---|---|---|
| Under about 1.0 mm, seam longer than about 100 mm, structural joint only | Stitch welding (short welds with gaps, then fill gaps in a skip sequence) | Heat is delivered in short bursts, so shrinkage does not accumulate along one line | Not for sealed joints. Gaps leak and trap moisture or coating fluids |
| Under about 1.5 mm, seal required | Continuous weld with pulsed current | Peak current gives fusion; the low background current lets the pool cool between pulses and lowers average heat input | Gains shrink as thickness rises, and pulsing cannot fix a poor fit-up gap |
| 304/316 stainless, visible face, any thin gauge | Copper backing bar plus pulsed current | Stainless conducts heat poorly, so it stays hot. Copper pulls heat out of the seam and reduces discoloration | Needs access to the back side. Do not use on closed sections. Keep the arc on the seam, not on the copper |
| Aluminum thin sheet | Pulsed AC TIG plus intermittent cooling | High conductivity moves heat into the whole panel, so a pause between passes keeps it from running away | Copper backing adds little because aluminum already dissipates heat; fixture mass helps more |
| Short joints under about 50 mm, 1.5 mm and above | Tack, then continuous weld with no extra control | Total heat is low and restraint is enough | Cosmetic parts may still need backing to avoid heat tint |
| Long joints on 2.5 mm and above, multiple seams on one part | Balanced sequence and intermittent cooling | Shrinkage forces add up across seams | Not needed if the part is rigid and only one short seam is welded |
For intermittent cooling, set an interpass temperature rather than a time. A common limit for austenitic stainless is around 150 °C, but follow the specification on your drawing. Pause until the area next to the seam falls under that limit before starting the next stitch.
Take a 1.5 mm 304 stainless cover with a 300 mm seam welded by TIG at 100 A, 11 V and 150 mm/min. Heat input is 11 × 100 × 60 ÷ (150 × 1000) = 0.44 kJ/mm. With a 0.6 efficiency factor, that is about 0.26 kJ/mm. If pulsing brings the average current to 70 A at the same speed, the figure falls to about 0.18 kJ/mm, roughly 30% less heat. Adding copper backing then lowers the peak temperature at the face. The numbers show direction only; confirm on a coupon.
The weld plan is done when a trial part meets the distortion budget you wrote at the start, not when the seam looks good. Measure flatness against a surface plate and check the position of nearby holes and bends. In our workflow, finished parts receive 100% dimensional and visual inspection before shipment, and material traceability comes with Mill Test Certificates for each batch. Those records matter here: a different material lot can behave differently on a seam you already proved.
| What you see | Likely cause | Revisit |
|---|---|---|
| Panel bows toward the weld side | Too much heat input or one-direction welding | Steps 1 and 5 |
| Oil-canning between seams | Residual stress from continuous welds on thin sheet | Stitch pattern, step 5 |
| Burn-through at seam start | Gap too wide or the current ramp too fast | Step 2 |
| Blue or brown tint on stainless | Slow travel, insufficient gas coverage or no backing | Steps 3 and 6 |
| Holes near the seam out of position | Shrinkage pulling toward the weld | Weld sequence, step 5 |
| Lack of fusion on the back side | Heat cut too far, or gap and fixture contact are uneven | Steps 2 and 6 |
Change one variable per trial. If you change current, speed and backing together, you will not know which fixed the problem.
Take your weld plan and check it against a trial coupon before release. If you have drawings ready, our engineering team can review seam length, thickness and cosmetic requirements and suggest stitch, pulsed or backed approaches. As a Mitsubishi Electric certified core supplier working to ISO 9001:2015, we run sheet metal fabrication with welding in-house, and prototype runs carry no minimum order quantity. Samples typically take 7-10 days.
Submit your drawings and weld callouts to request a quote or a prototype trial.